what i did with my summer vacation
Posted: July 27th, 2010 | Author: admin | Filed under: malabrigo, non-crafty, projects: bellevue cardigan, sweaters, things i knit, yarn i use | Tags: bellevue, fingering weight, knitting, queues, sweaters | 1 Comment »So this summer, one of my goals was to make sure I traveled at least a little. This is year is the last one where I’ll have a “summer vacation” before I start studying in earnest and need to be a responsible grownup, and – since it’s been a goal of mine, for a few years now – I thought this year would be a good one to go to Comic Con with a few friends.
It. Was. Awesome.
I saw a lot of people dressed as superheroes, and met up with rad knitters for a bit, and saw a lot of really, really excellent panels that I can’t believe I was allowed to go to. One of the really interesting things about going was seeing the odd sort of subculture that develops within the convention itself – basic social rules suddenly change the second you get that badge and actually step into the convention hall. For instance, despite the fact that I’m sure most of the people at the convention are not three hour line sorts of people, once you’re there, it becomes totally reasonable to wait in line for something (like getting to see a panel with the cast of Fringe, be still my heart) for two or three hours. This may have happened to me more than once over my four day trip.
This is my Bellevue. When I left, I’d finished the body and most of one sleeve. Thanks to all of those long lines, it very nearly became The Sweater I Finished At Comic Con. As it is, I’m moving merrily along on the yoke (which goes quickly), and getting very excited about having this in my wardrobe.

